Roadworks
Contents
- Roadworks
- Current works
- Surface dressing
- Other types of roadworks
Current works
We must ask that vehicles are not parked on the road within the works area during the road closure periods. We also recommend you plan extra time for your journeys.
We hope this information is helpful and we apologise for any inconvenience these essential works may cause. We will make every effort to minimise any unnecessary disruption.
Our team on site will be ready to assist you with any issues you may have during the work and we hope you will find our employees courteous and helpful.
Road Closure: Overnight traffic management installation on the roundabout and adjoining roads for safety
When: 1April 2025 to 3 April 2025
Working Hours: 8pm to 6am (2 night shifts)
Details: Partial closures with diversions
Utilising our roadmender machine, we will be carrying out some carriageway patch repairs on Caswell Road. Please note that this is not a resurfacing scheme.
Where: Caswell Road, Brackmills
When: Monday 31 March 2025 to Friday 4 April 2025
Working Hours: 9.30am to 2:30pm (road will be accessible as normal outside of these hours)
Traffic Management
There will be a full road closure.
Residents
Residents will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Please be assured that we aim to maintain access for residents or businesses. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site. Advanced warning signs will be placed in the area prior to the works starting. Thank you for your understanding, patience, and co-operation.
Public transport
There will be no access for public transport.
We will be utilising the JCB pothole pro to carry out carriageway patching.
Where: Eastcote Road, Bugbrooke
When: 17 March 2025 to 21 March 2025
Working Hours: 9am to 3pm (road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure with a diversion route in place.
Residents
Residents will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Please be assured that we aim to maintain access for residents/businesses. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site. Advanced warning signs will be placed in the area prior to the works starting. Thank you for your understanding, patience, and co-operation.
Public Transport
A diversion route will be in place.
We will be carrying out micro-resurfacing work in your area within the next 2 weeks. Micro-asphalt significantly extends the lifespan of the road and is also an economical treatment.
Area:
- Harborough Road
When: Please refer to the yellow information boards which will be erected 5 to 10 days before work commences. Information boards will be located at either end of the works area. You will receive another information fact sheet with more information 48 to 72 hours prior to the start of works. Due to the nature and fluidity of work, we cannot confirm dates until nearer the time.
Residents or businesses
Access will be maintained for residents when safe to do so. The site team will assist with access requirements. Please allow extra time for your journey.
Emergency vehicles
We aim to maintain access for emergency vehicles when safe to do so.
Pedestrians and cyclists
Footways will remain open for pedestrians. Cyclists will be asked to dismount and use the footway.
Public Transport
Bus services will be notified of the works and will make alternative arrangements. Please contact your local bus provider for further information.
Towaway vehicles
Parked vehicles in the works area will be towed by an approved contractor. Please do not park in the works zone.
We will be carrying out micro-resurfacing work in your area within the next 2 weeks. Micro-asphalt significantly extends the lifespan of the road and is also an economical treatment.
Areas:
- Church Street
- Yelvertoft Road
When: Please refer to the yellow information boards which will be erected 5 to 10 days before work commences. Information boards will be located at either end of the works area. You will receive another information fact sheet with more information 48 to 72 hours prior to the start of works. Due to the nature and fluidity of work, we cannot confirm dates until nearer the time.
Residents or businesses
Access will be maintained for residents when safe to do so. The site team will assist with access requirements. Please allow extra time for your journey.
Emergency vehicles
We aim to maintain access for emergency vehicles when safe to do so.
Pedestrians and cyclists
Footways will remain open for pedestrians. Cyclists will be asked to dismount and use the footway.
Public Transport
Bus services will be notified of the works and will make alternative arrangements. Please contact your local bus provider for further information.
Towaway vehicles
Parked vehicles in the works area will be towed by an approved contractor. Please do not park in the works zone.
We will be carrying out micro-resurfacing work in your area within the next 2 weeks. Micro-asphalt significantly extends the lifespan of the road and is also an economical treatment.
Area:
- Welton Road
When: Please refer to the yellow information boards which will be erected 5 to 10 days before work commences. Information boards will be located at either end of the works area. You will receive another information fact sheet with more information 48 to 72 hours prior to the start of works. Due to the nature and fluidity of work, we cannot confirm dates until nearer the time.
Residents or businesses
Access will be maintained for residents when safe to do so. The site team will assist with access requirements. Please allow extra time for your journey.
Emergency vehicles
We aim to maintain access for emergency vehicles when safe to do so.
Pedestrians and cyclists
Footways will remain open for pedestrians. Cyclists will be asked to dismount and use the footway.
Public Transport
Bus services will be notified of the works and will make alternative arrangements. Please contact your local bus provider for further information.
Towaway vehicles
Parked vehicles in the works area will be towed by an approved contractor. Please do not park in the works zone.
We will be carrying out micro-resurfacing work in your area within the next 2 weeks. Micro-asphalt significantly extends the lifespan of the road and is also an economical treatment.
Areas:
- Main Street
- Whiston Road
When: Please refer to the yellow information boards which will be erected 5 to 10 days before work commences. Information boards will be located at either end of the works area. You will receive another information fact sheet with more information 48 to 72 hours prior to the start of works. Due to the nature and fluidity of work, we cannot confirm dates until nearer the time.
Residents or businesses
Access will be maintained for residents when safe to do so. The site team will assist with access requirements. Please allow extra time for your journey.
Emergency vehicles
We aim to maintain access for emergency vehicles when safe to do so.
Pedestrians and cyclists
Footways will remain open for pedestrians. Cyclists will be asked to dismount and use the footway.
Public Transport
Bus services will be notified of the works and will make alternative arrangements. Please contact your local bus provider for further information.
Towaway vehicles
Parked vehicles in the works area will be towed by an approved contractor. Please do not park in the works zone.
We will be utilising the JCB pothole pro to carry out carriageway patching.
Where: Whilton Road, Great Brington
When: 24 March 2025 to 28 March 2025
Working Hours: 9am to 3pm (road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure with a diversion route in place.
Residents
Residents will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Please be assured that we aim to maintain access for residents/businesses. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site. Advanced warning signs will be placed in the area
prior to the works starting. Thank you for your understanding, patience, and co-operation.
Public transport
A diversion route will be in place as seen on the map overleaf.
Alcombe Road
We will be carrying out some carriageway repairs along Alcombe Road. Please note that this is not a resurfacing scheme and is also weather dependant due to the material used.
Where: Alcombe Road, Northampton
When: 31 March 2025
Working Hours: 9am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Alcombe Terrace and Overstone Road. There will be access only for residents/visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents or businesses
Residents and businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclists please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
N/A
Crestwood Road
We will be carrying out some carriageway repairs along Crestwood Road. Please note that this is not a resurfacing scheme.
Where: Crestwood Road, Northampton
When: 24 March 2025 (weather dependant)
Working Hours: 9am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Lings Way and Crestwood Close. There will be access only for residents/visitors. There may be shortperiods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents and businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclist`s please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
Will not be affected.
Eastern Avenue South
We will be carrying out some carriageway repairs on Eastern Avenue South. Please note that this is not a resurfacing
scheme.
Where: Eastern Avenue South, Northampton – between Langdale Road and St David's Road
When: 14 April 2025
Working Hours: 09:30am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Langdale Road and St David's Road. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents and businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time. During the working days it would be recommended to park your vehicles outside of the road closure area if you intend to use them.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclists please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public transport
There will be no access through for public transport
Garfield Street
We will be carrying out some carriageway repairs along Garfield Street. Please note that this is not a resurfacing scheme and is also weather dependant due to the material used.
Where: Garfield Street, Northampton
When: 11 April 2025
Working Hours: 9:30am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Kingswell Road and Lincoln Street. There will be access only for residents/visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents or businesses
Residents and businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and Cyclists
Pedestrians will be unaffected by the works. Cyclists please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
There will be no access through the closure for public transport
Grange Road
We will be carrying out some carriageway repairs on Grange Road. Please note that this is not a resurfacing scheme
and is also weather dependant due to the material used.
Where: Grange Road - between Broadmead Avenue and Booth Lane North, Northampton
When: 1 April 2025 to 4 April 2025
Working Hours: 9:30am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Broadmead Avenue and Booth Lane North. There will be access only for residents/visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents and businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclists please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
No access for public transport through the road closure
Kenmuir Avenue
We will be carrying out some carriageway repairs on Kenmuir Avenue. Please note that this is not a resurfacing
scheme.
Where: Kenmuir Avenue, Northampton – at the junction with Hazeldene Road
When: 15 April 2025 to 16 April 2025
Working Hours: 09:30am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Hazeldene Road and Rothesay Road. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents and businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclists please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public transport
There will be no access through for public transport
Landcross Drive
We will be carrying out some carriageway repairs along Landcross Drive. Please note that this is not a resurfacing scheme and is also weather dependant due to the material used.
Where: Landcross Drive, Northampton
When: 10 April 2025
Working Hours: 09:30 to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Lynmouth Avenue and Meshaw Crescent. There will be access only for residents/visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents or businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclists please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
There will be no access through the closure for public transport.
Lanercost Walk
We will be carrying out some carriageway repairs along Lanercost Walk. Please note that this is not a resurfacing scheme and is also weather dependant due to the material used.
Where: Lanercost Walk, Northampton
When: 7 April 2025
Working Hours: 8am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Keswick Drive and Windermere Way. There will be access only for residents/visitors. There may beshort periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents and businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclist`s please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
N/A
Link Road
We will be carrying out some carriageway repairs along Link Road. Please note that this is not a resurfacing scheme.
Where: Link Road, Northampton
When: 26 March 2025 (weather dependant)
Working Hours: 09:30am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Acre Lane and the entrance to the shops. There will be access only for residents/visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents or businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclist's please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
N/A
Link Road
Will be carrying out carriageway resurfacing works along Lower Mount Northampton. This work will include
new asphalt surfacing, anti-skid, road markings, iron work and traffic signal detection equipment.
Where: Along the A4500 from the junction of St Michael’s Road to Abington Square and York Road to Junction of St Edmund’s Street.
When:
- 24 March 2025 to 29 March 2025
- 31 March 2025 to 4 April 2025
- 7 April 2025 to 11 April 2025
Working Hours: 8pm to 6am
Traffic Management
A road closure will be in place along with an approved diversion route. Please do not park on the carriageway during these works. We reserve the right to tow away any vehicles restricting the works.
Residents or businesses
Access for residents/businesses within the closure will be maintained where possible. However, prolonged delays are to be expected. There will be no access through the closure for any businesses/residents
outside the closure extents.
Emergency vehicles
We aim to maintain access for emergency vehicles when safe to do so.
Pedestrians and cyclists
Cyclists will be asked to follow the traffic management diversion route. Alternatively, cyclists can dismount the bicycle and walk on the footway. Footways will remain open for pedestrians with the carriageway being barriered off.
Public Transport
Bus stops on A4500 will be suspended during the works. Bus services will be notified of the works and will make alternative arrangements. Please contact your local bus provider for further information.
Manfield Road
We will be carrying out some carriageway repairs between the junction with Wellingborough Road and the entrance to
Burlington Court. Please note that this is not a resurfacing scheme and is also weather dependant due to the material used.
Where: Manfield Road, Northampton
When: 24 March 2025
Working Hours: 9:30am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Wellingborough Road and the entrance to Burlington Court. There will be access only for residents/visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents and businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclists please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
N/A
Perry Street
We will be carrying out some carriageway repairs along Perry Street. Please note that this is not a resurfacing scheme.
Where: Perry Street, Northampton
When: 24 March 2025 (weather dependant)
Working Hours: 09:30am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Stimpson Avenue and Magee Street. There will be access only for residents and visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents and businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclist`s please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
N/A
St John's Avenue
We will be carrying out some carriageway repairs along St John's Avenue. Please note that this is not a resurfacing scheme and is also weather dependant due to the material used.
Where: St John's Avenue, Northampton
When: 8 April 2025
Working Hours: 9am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between house 1 to 37. There will be access only for residents/visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents or businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclists please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
N/A
Talbot Road
We will be carrying out micro-resurfacing work in your area within the next 2 weeks. Micro-asphalt significantly extends the lifespan of the road and is also an economical treatment.
When: Please refer to the yellow information boards which will be erected 5 to 10 days before work commences. Information boards will be located at either end of the works area. You will receive another information fact sheet with more information 48 to 72 hours prior to the start of works. Due to the nature and fluidity of work, we cannot confirm dates until nearer the time.
Residents or businesses
Access will be maintained for residents when safe to do so. The site team will assist with access requirements. Please allow extra time for your journey.
Emergency vehicles
We aim to maintain access for emergency vehicles when safe to do so.
Pedestrians and cyclists
Footways will remain open for pedestrians. Cyclists will be asked to dismount and use the footway.
Public Transport
Bus services will be notified of the works and will make alternative arrangements. Please contact your local bus provider for further information.
Towaway vehicles
Parked vehicles in the works area will be towed by an approved contractor. Please do not park in the works zone.
Thirlemere Avenue
We will be carrying out some carriageway repairs along Thirlemere Avenue. Please note that this is not a resurfacing scheme.
Where: Thirlemere Avenue, Northampton
When: 31 March 2025 (weather dependant)
Working Hours: 09:30am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Grange Road and Fullingdale Road. There will be access only for residents/visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents and businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclist’s please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
N/A
Vicarage Close
We will be carrying out some carriageway repairs along Vicarage Close. Please note that this is not a resurfacing scheme.
Where: Vicarage Close, Northampton
When: 27 March 2025 to 28 March 2025 (weather dependant)
Working Hours: 8am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be access only for residents/visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents and businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclist's please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
N/A
Woodland Avenue
We will be carrying out some carriageway repairs along Woodland Avenue. Please note that this is not a resurfacing
scheme and is also weather dependant due to the material used.
Where: Woodland Avenue, Northampton
When: 9 April 2025
Working Hours: 9:30am to 3pm (the road will be accessible as normal outside of these hours)
Traffic Management
There will be a road closure between Birchfield Road East and Wellingborough Road. There will be access only for residents/visitors. There may be short periods where vehicles will be prohibited due to the repair process. During these times vehicle access will be restricted. Please allow extra time for your journeys and consult with the Traffic Management on site.
Residents or businesses
Residents and Businesses will have access to their properties at all times, but please allow for extra time.
Emergency vehicles
We will maintain access for emergency vehicles.
Pedestrians and cyclists
Pedestrians will be unaffected by the works. Cyclists please follow any instructions from the Traffic Management on site. Thank you for your understanding, patience, and co-operation.
Public Transport
N/A
We will be carrying out micro-resurfacing work in your area within the next 2 weeks. Micro-asphalt significantly extends the lifespan of the road and is also an economical treatment.
Areas:
- Simons Walk
- Leys Road
- Festival Road
When: Please refer to the yellow information boards which will be erected 5 to 10 days before work commences. Information boards will be located at either end of the works area. You will receive another information fact sheet with more information 48 to 72 hours prior to the start of works. Due to the nature and fluidity of work, we cannot confirm dates until nearer the time.
Residents or businesses
Access will be maintained for residents when safe to do so. The site team will assist with access requirements. Please allow extra time for your journey.
Emergency vehicles
We aim to maintain access for emergency vehicles when safe to do so.
Pedestrians and cyclists
Footways will remain open for pedestrians. Cyclists will be asked to dismount and use the footway.
Public Transport
Bus services will be notified of the works and will make alternative arrangements. Please contact your local bus provider for further information.
Towaway vehicles
Parked vehicles in the works area will be towed by an approved contractor. Please do not park in the works zone.
Where: A45 Queen Eleanor Interchange, Northampton
What: Improvement works to this roundabout and its slip roads, and adjoining junctions will take place and will include:
- earthworks
- carriageway widening
- new drainage connections
- new service ducts
- structure repairs and works including
- waterproofing
- kerbing
- carriageway surfacing
- upgrading of traffic signals new road traffic signs and markings
When: Monday 31 March 2025 to December 2025
Working Hours:
- weekdays between 8am and 5pm and some weekends.Times may vary within these hours.
Full roundabout closures will be necessary at times, but these will occur at nighttime or off-peak. Further details will be sent 2 weeks prior to these full closures.
Traffic Management
Traffic management will be in place 24/7 with a lane closure in place and traffic lights turned off. One lane will be open. A full closure will be in place on the cul-de-sac on London Road as well.
A lane closure will be in place leading into Wootton Hall Park with no entry permitted via the slip road. A one-way system will be in place. Please follow the signage.
Residents or businesses
Residents and businesses will have access to their properties at all times.
Emergency vehicles
Access will be maintained for emergency vehicles but please expect delays. During full closures, an approved diversion route will be in place.
Pedestrians and cyclists
Safe and accessible diversion routes will be in place for pedestrians and dismounted cyclists. Pedestrians with visual or mobility impairments will be assisted during work hours.
A4500, Upton between Sandy Lane roundabout and Upton Valley Way North.
To assist with the ongoing works on the road that runs between Berrywood Road at the north and A4500 at the south, lane closures will be in place on the A4500. These lane closures will assist the works to link this section of road.
When: Traffic management will be in place from Wednesday 5 March 2025 to Friday 4 April 2025
Traffic Management
Lane closures will be in place both eastbound and westbound to facilitate our works. The extent of the lane closures are shown below. These will be in place 24/7 during these dates. Please expect delays.
Working Hours
Works will be undertaken mainly during the daytime with some night-time works.
Emergency vehicles
Access as normal, but please expect delays.
Pedestrians and cyclists
Footways and crossing points will be unaffected.
Public transport
To ensure safety, 2 bus stops will be temporarily suspended along this section. Please see image showing which stops. Bus companies have been notified. Please use alternative bus stops during this time.
We will be carrying out micro-resurfacing work in your area within the next 2 to 3 weeks. Micro-asphalt significantly extends the lifespan of the road and is also an economical treatment.
Areas:
- High Street
- Old Road
When: Please refer to the yellow information boards which will be erected 5 to 10 days before work commences. Information boards will be located at either end of the works area. You will receive another information fact sheet with more information 48 to 72 hours prior to the start of works. Due to the nature and fluidity of work, we cannot confirm dates until nearer the time.
Residents or businesses
Access will be maintained for residents when safe to do so. The site team will assist with access requirements. Please allow extra time for your journey.
Emergency vehicles
We aim to maintain access for emergency vehicles when safe to do so.
Pedestrians and cyclists
Footways will remain open for pedestrians. Cyclists will be asked to dismount and use the footway.
Public Transport
Bus services will be notified of the works and will make alternative arrangements. Please contact your local bus provider for further information.
Towaway vehicles
Parked vehicles in the works area will be towed by an approved contractor. Please do not park in the works zone.
We will be carrying out micro-resurfacing work in your area within the next 2 weeks. Micro-asphalt significantly extends the lifespan of the road and is also an economical treatment.
Areas:
- Bridge Road
- Chapel Lane
- Rookery Lane
When: Please refer to the yellow information boards which will be erected 5 to 10 days before work commences. Information boards will be located at either end of the works area. You will receive another information fact sheet with more information 48 to 72 hours prior to the start of works. Due to the nature and fluidity of work, we cannot confirm dates until nearer the time.
Residents or businesses
Access will be maintained for residents when safe to do so. The site team will assist with access requirements. Please allow extra time for your journey.
Emergency vehicles
We aim to maintain access for emergency vehicles when safe to do so.
Pedestrians and cyclists
Footways will remain open for pedestrians. Cyclists will be asked to dismount and use the footway.
Public Transport
Bus services will be notified of the works and will make alternative arrangements. Please contact your local bus provider for further information.
Towaway vehicles
Parked vehicles in the works area will be towed by an approved contractor. Please do not park in the works zone.
We will be carrying out micro-resurfacing work in your area within the next 2 weeks. Micro-asphalt significantly extends the lifespan of the road and is also an economical treatment.
Areas:
- Sywell Road
- Overstone
- Overstone Road
When: Please refer to the yellow information boards which will be erected 5 to 10 days before work commences. Information boards will be located at either end of the works area. You will receive another information fact sheet with more information 48 to 72 hours prior to the start of works. Due to the nature and fluidity of work, we cannot confirm dates until nearer the time.
Residents or businesses
Access will be maintained for residents when safe to do so. The site team will assist with access requirements. Please allow extra time for your journey.
Emergency vehicles
We aim to maintain access for emergency vehicles when safe to do so.
Pedestrians and cyclists
Footways will remain open for pedestrians. Cyclists will be asked to dismount and use the footway.
Public Transport
Bus services will be notified of the works and will make alternative arrangements. Please contact your local bus provider for further information.
Towaway vehicles
Parked vehicles in the works area will be towed by an approved contractor. Please do not park in the works zone.
Last updated 20 March 2025